Suche schließen

Lausitzbad: Construction site flight

Since April 2023, a lot of work has been going on at and in the Lausitzbad. As part of the structural change, the entire facility is being restructured and expanded. This also includes expanding the pool capacity with an additional 25-metre sports pool and a baby pool.

The video gives a small insight into the construction work on the new 25-metre pool (as of November 2023).